{"id":29043,"date":"2016-08-01T23:16:03","date_gmt":"2016-08-01T23:16:03","guid":{"rendered":"http:\/\/wordpress.home\/?page_id=29043"},"modified":"2023-07-19T12:00:31","modified_gmt":"2023-07-19T12:00:31","slug":"energy-summit-on-draft-for-eeg-2-0-seeks-compromise","status":"publish","type":"post","link":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/","title":{"rendered":"Energy Summit on Draft for &#8220;EEG 2.0&#8221; Seeks Compromise"},"content":{"rendered":"<h3>Mannheim, August 01, 2016<\/h3>\n<p>On July 08, 2016, the German Parliament adopted the amended <a href=\"http:\/\/www.bmwi.de\/BMWi\/Redaktion\/PDF\/G\/gesetzentwurf-ausschreibungen-erneuerbare-energien-aenderungen-eeg-2016,property=pdf,bereich=bmwi2012,sprache=de,rwb=true.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">Renewable Energies Act 2017<\/a> (EEG 2017). Subject to notification by the European Commission, the act will enter into force on January\u00a001,\u00a02017. One of the goals of the EEG 2017 is to promote the further expansion of renewable energies by increasing their share in the power generation from 32.5\u00a0percent in 2015 to 40 to 45\u00a0percent by 2025. On the other hand, the EEG 2017 supports the transition to competitive tendering of the subsidization.<\/p>\n<p>So far, the legislator has subsidized the construction of wind, solar, hydropower, geothermal, and biomass plants with fixed rates. For this, every plant operator receives the subsidy rates per generated kWh of power as determined by the government. Furthermore, the network operators are required by law to buy eco-power from the plant owners and to feed it into the power grid preferentially. For this subsidization of eco-power, all power customers in Germany pay the so-called &#8220;EEG levy&#8221;, as every consumer can see in the power bill.<\/p>\n<p>Meanwhile, renewable energies account for about one third of Germany&#8217;s power generation. However, the capacity increase has outpaced the development of the transmission networks that transport the power through Germany. The EEG reform is supposed to slow down the development of eco-power plants. At the same time, the steady increase of the EEG levy is to be reduced. For this reason, larger plants will no longer benefit from fixed rates. <\/p>\n<figure style=\"width: 800px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" title=\"Appin Powers Station, Australia\" src=\"https:\/\/caterpillar-energy-solutions.de\/files\/upload\/image\/6318_2_CES-Energiegipfel.jpg\" title=\"Energy Summit on Draft\" alt=\"Appin Powers Station, Australia\" width=\"800\" height=\"521\" \/><figcaption class=\"wp-caption-text\">Cat Reference system for mine gas: Appin Powers Station, Australia<\/figcaption><\/figure>\n<p>According to the amendment, the market is to make its choice on the basis of a competitive tendering procedure. The tender volume will be calculated so as to comply with the development corridor (renewable share of 40 to 45\u00a0percent in 2025). Larger plants with capacities of more than 750\u00a0kW (biomass plants from 150\u00a0kW) will no longer receive any fixed subsidies. From 2017, they will have to participate in a tendering procedure. This also applies to existing plants. Thus, contracts will be awarded to those eco-power plant operators who apply for the lowest subsidization. This subsidy rate will be paid for 20 years. Henceforth, about 80\u00a0percent of the power from new plants will be tendered in this way. This especially affects new hydropower, geothermal, landfill gas, sewage gas, and mine gas plants. At the recommendation of the Federal Council, the federal government is currently examining how tenders for biomass plants could be implemented in a meaningful way.<\/p>\n<h3>Transitional Regulations Require Plant Operators to Act Speedily<\/h3>\n<p>The existing government subsidy rates will continue to apply to plants that are approved by the end of 2016 and installed by the end of 2018. Until the end of 2018, biomass plants that are approved or licensed prior to January\u00a01,\u00a02017 can go live according to the rules of the previous EEG reform in 2014.<br \/>\u00a0<br \/>All operators of existing plants who are compensated according to the market premium model will continue to be entitled to the flexibility bonus (also called &#8220;flex bonus&#8221;). The purpose of the flexibility bonus is to increase the share of controllable, flexible power production in order to produce as much power as possible when the demand for power is high, but cannot be fully covered with renewable energies. The flex bonus financially supports plant operators after they have stepped up the installed capacity of their plants. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>After 16 years, the Renewable Energy Sources Act is to be reformed by the end of 2016 with the aim of significantly increasing the share of renewable energies in electricity generation in Germany.<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[7],"tags":[],"class_list":["post-29043","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Energy Summit on Draft for &quot;EEG 2.0&quot; Seeks Compromise - Caterpillar Energy Solutions<\/title>\n<meta name=\"description\" content=\"After 16 years, the Renewable Energy Sources Act is to be reformed by the end of 2016 with the aim of significantly increasing the share of renewable energies in electricity generation in Germany.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Energy Summit on Draft for &quot;EEG 2.0&quot; Seeks Compromise - Caterpillar Energy Solutions\" \/>\n<meta property=\"og:description\" content=\"After 16 years, the Renewable Energy Sources Act is to be reformed by the end of 2016 with the aim of significantly increasing the share of renewable energies in electricity generation in Germany.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/\" \/>\n<meta property=\"og:site_name\" content=\"Caterpillar Energy Solutions\" \/>\n<meta property=\"article:published_time\" content=\"2016-08-01T23:16:03+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-19T12:00:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/caterpillar-energy-solutions.de\/files\/upload\/image\/6318_2_CES-Energiegipfel.jpg\" \/>\n<meta name=\"author\" content=\"uvidic\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"uvidic\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/\"},\"author\":{\"name\":\"uvidic\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#\\\/schema\\\/person\\\/e11849afdf71946195b1db21380106ff\"},\"headline\":\"Energy Summit on Draft for &#8220;EEG 2.0&#8221; Seeks Compromise\",\"datePublished\":\"2016-08-01T23:16:03+00:00\",\"dateModified\":\"2023-07-19T12:00:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/\"},\"wordCount\":552,\"publisher\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/files\\\/upload\\\/image\\\/6318_2_CES-Energiegipfel.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/\",\"url\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/\",\"name\":\"Energy Summit on Draft for \\\"EEG 2.0\\\" Seeks Compromise - Caterpillar Energy Solutions\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/files\\\/upload\\\/image\\\/6318_2_CES-Energiegipfel.jpg\",\"datePublished\":\"2016-08-01T23:16:03+00:00\",\"dateModified\":\"2023-07-19T12:00:31+00:00\",\"description\":\"After 16 years, the Renewable Energy Sources Act is to be reformed by the end of 2016 with the aim of significantly increasing the share of renewable energies in electricity generation in Germany.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/files\\\/upload\\\/image\\\/6318_2_CES-Energiegipfel.jpg\",\"contentUrl\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/files\\\/upload\\\/image\\\/6318_2_CES-Energiegipfel.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/news\\\/news-releases\\\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Energy Summit on Draft for &#8222;EEG 2.0&#8220; Seeks Compromise\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/\",\"name\":\"Caterpillar Energy Solutions\",\"description\":\"Caterpillar Energy Solutions\",\"publisher\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#organization\",\"name\":\"Caterpillar Energy Solutions\",\"url\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/cropped-cropped-logo-ces_144.png\",\"contentUrl\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/wp-content\\\/uploads\\\/2020\\\/12\\\/cropped-cropped-logo-ces_144.png\",\"width\":1530,\"height\":250,\"caption\":\"Caterpillar Energy Solutions\"},\"image\":{\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/caterpillar-energy-solutions.de\\\/en\\\/#\\\/schema\\\/person\\\/e11849afdf71946195b1db21380106ff\",\"name\":\"uvidic\",\"sameAs\":[\"https:\\\/\\\/caterpillar-energy-solutions.de\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Energy Summit on Draft for \"EEG 2.0\" Seeks Compromise - Caterpillar Energy Solutions","description":"After 16 years, the Renewable Energy Sources Act is to be reformed by the end of 2016 with the aim of significantly increasing the share of renewable energies in electricity generation in Germany.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/","og_locale":"en_US","og_type":"article","og_title":"Energy Summit on Draft for \"EEG 2.0\" Seeks Compromise - Caterpillar Energy Solutions","og_description":"After 16 years, the Renewable Energy Sources Act is to be reformed by the end of 2016 with the aim of significantly increasing the share of renewable energies in electricity generation in Germany.","og_url":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/","og_site_name":"Caterpillar Energy Solutions","article_published_time":"2016-08-01T23:16:03+00:00","article_modified_time":"2023-07-19T12:00:31+00:00","og_image":[{"url":"https:\/\/caterpillar-energy-solutions.de\/files\/upload\/image\/6318_2_CES-Energiegipfel.jpg","type":"","width":"","height":""}],"author":"uvidic","twitter_card":"summary_large_image","twitter_misc":{"Written by":"uvidic","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/#article","isPartOf":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/"},"author":{"name":"uvidic","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#\/schema\/person\/e11849afdf71946195b1db21380106ff"},"headline":"Energy Summit on Draft for &#8220;EEG 2.0&#8221; Seeks Compromise","datePublished":"2016-08-01T23:16:03+00:00","dateModified":"2023-07-19T12:00:31+00:00","mainEntityOfPage":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/"},"wordCount":552,"publisher":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#organization"},"image":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/#primaryimage"},"thumbnailUrl":"https:\/\/caterpillar-energy-solutions.de\/files\/upload\/image\/6318_2_CES-Energiegipfel.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/","url":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/","name":"Energy Summit on Draft for \"EEG 2.0\" Seeks Compromise - Caterpillar Energy Solutions","isPartOf":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/#primaryimage"},"image":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/#primaryimage"},"thumbnailUrl":"https:\/\/caterpillar-energy-solutions.de\/files\/upload\/image\/6318_2_CES-Energiegipfel.jpg","datePublished":"2016-08-01T23:16:03+00:00","dateModified":"2023-07-19T12:00:31+00:00","description":"After 16 years, the Renewable Energy Sources Act is to be reformed by the end of 2016 with the aim of significantly increasing the share of renewable energies in electricity generation in Germany.","breadcrumb":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/#primaryimage","url":"https:\/\/caterpillar-energy-solutions.de\/files\/upload\/image\/6318_2_CES-Energiegipfel.jpg","contentUrl":"https:\/\/caterpillar-energy-solutions.de\/files\/upload\/image\/6318_2_CES-Energiegipfel.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/news\/news-releases\/energy-summit-on-draft-for-eeg-2-0-seeks-compromise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/caterpillar-energy-solutions.de\/en\/"},{"@type":"ListItem","position":2,"name":"Energy Summit on Draft for &#8222;EEG 2.0&#8220; Seeks Compromise"}]},{"@type":"WebSite","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#website","url":"https:\/\/caterpillar-energy-solutions.de\/en\/","name":"Caterpillar Energy Solutions","description":"Caterpillar Energy Solutions","publisher":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/caterpillar-energy-solutions.de\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#organization","name":"Caterpillar Energy Solutions","url":"https:\/\/caterpillar-energy-solutions.de\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#\/schema\/logo\/image\/","url":"https:\/\/caterpillar-energy-solutions.de\/wp-content\/uploads\/2020\/12\/cropped-cropped-logo-ces_144.png","contentUrl":"https:\/\/caterpillar-energy-solutions.de\/wp-content\/uploads\/2020\/12\/cropped-cropped-logo-ces_144.png","width":1530,"height":250,"caption":"Caterpillar Energy Solutions"},"image":{"@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/caterpillar-energy-solutions.de\/en\/#\/schema\/person\/e11849afdf71946195b1db21380106ff","name":"uvidic","sameAs":["https:\/\/caterpillar-energy-solutions.de"]}]}},"_links":{"self":[{"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/posts\/29043","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/comments?post=29043"}],"version-history":[{"count":3,"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/posts\/29043\/revisions"}],"predecessor-version":[{"id":41411,"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/posts\/29043\/revisions\/41411"}],"wp:attachment":[{"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/media?parent=29043"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/categories?post=29043"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/caterpillar-energy-solutions.de\/en\/wp-json\/wp\/v2\/tags?post=29043"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}